looking better at this stage as we close in on the 16th
buys 15,969,308 v sells 7.8 mill low 12 high 14 last 13.5
turnover ..stable...6.7 mill..
blocker at 14 for now 1.6 mill....but may get rolled as we move to close
afr article points of interest Premium of approximately 88% to the 20-day volume weighted average price
Cupric intends to advance the Ghanzi project through the design, construction and operational phases of its development. cheaper to buy an existing NEW Operational plant nearby saves time,money and brings in immediate cash flow once new ore is introduced and operational expenses are reduced
but I feel cupic is building this little empire with an near term buyer in mind...the buyer not wanting to show themselves as it would spike the price
DML Price at posting:
13.5¢ Sentiment: ST Buy Disclosure: Held