RNE 0.00% 0.2¢ renu energy limited

todays drilling report, page-3

  1. 154 Posts.
    ASX ANNOUNCEMENT 2 JANUARY 2008
    Habanero 3 Drilling Progress

    Geodynamics is pleased to advise that the drilling of Habanero 3 is progressing in
    the 311mm (12¼") diameter section of the well now at 4,011m (13,158ft).

    There remains around 49m (162ft) to complete the current 12¼" section which will
    then be cased and cemented before the final 216 mm diameter (8½") open hole
    section in the granite is drilled. (final open hole section is planned to be 192m
    (630 ft).

    Target total well depth is approximately 4,252 m (13,950 ft).
 
watchlist Created with Sketch. Add RNE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.