drilling schedule sept 2006. They say they are drilling two holes in September 2006.
More mirage wells are to be put in production and have almost finalised a farmin arrangement with santos.
All looks well to me....................
drilling schedule sept 2006. They say they are drilling two...
Add to My Watchlist
What is My Watchlist?