STX 0.00% 22.0¢ strike energy limited

There requires more drilling to prove the resource in EP469....

  1. 120 Posts.
    lightbulb Created with Sketch. 31
    There requires more drilling to prove the resource in EP469. There are fault structures that require another hole (or even 2) around WE2 to book a reserve I believe.

    However, given the successes in this drill and the great correlations between the seismic data and what they’ve found, there is little risk (IMO) in that component of the work.

    The fairway/nearology are based on seismic data and offset wells. Have been pretty spot thus far re:seismic!!
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
22.0¢
Change
0.000(0.00%)
Mkt cap ! $629.6M
Open High Low Value Volume
22.0¢ 22.5¢ 21.5¢ $1.075M 4.892M

Buyers (Bids)

No. Vol. Price($)
6 491938 21.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 41858 1
View Market Depth
Last trade - 16.10pm 30/04/2024 (20 minute delay) ?
Last
22.0¢
  Change
0.000 ( 0.23 %)
Open High Low Volume
22.5¢ 22.5¢ 21.5¢ 1288173
Last updated 16.05pm 30/04/2024 ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.