"It is planned to conduct the flow back of the co-mingled two stages up to a seven day period, with the objective to attain maximum clean-up of the well and to establish a combined stabilised gas flow rate during the time available."
So there was never going to be a flow test done by today.
There is good consistently high volume of water being injected form the two zones, along with increasing gas.
Sellers tomorrow will either have pulled a stroke of genesis or a potential huge blunder.
Monday will tell.
NWE Price at posting:
5.8¢ Sentiment: Buy Disclosure: Held