IVZ 4.05% 7.1¢ invictus energy ltd

The critical difference between the main hole and the...

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    The critical difference between the main hole and the sidetrack....the sidetrack is being drilled with different mud parameers and will be logged as soon as drilling is complete. Also note the sidetrack will penetrate a section that was successfully logged in the original bore (ie 3500m to casing shoe).
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.