True enough.
But prior to that is the confirmation of technology and process, and the ability to control the reaction without falling foul of the conditions as laid down by the terms of the approval.
As to how the product will be used once produced is somewhat immaterial at this stage, and is largely a sideshow.
Get the process underway, proven, verifiable and controllable, then optimise return.
- Forums
- ASX - By Stock
- Tony Lawry, Rotary club of Adelaide Speech
True enough. But prior to that is the confirmation of technology...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.543M |
Open | High | Low | Value | Volume |
0.3¢ | 0.4¢ | 0.3¢ | $7.14K | 2.378M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 26529745 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 24056713 | 25 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 26529745 | 0.003 |
68 | 82905435 | 0.002 |
22 | 91505000 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 24056713 | 25 |
0.005 | 6375663 | 19 |
0.006 | 4917520 | 7 |
0.007 | 841000 | 2 |
0.008 | 200000 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
NRZ (ASX) Chart |