Foz,
BFS might not be favourable on a 2mtp, but over time and recovery on costs i think very favourable once scale up is proven to 5,10 and 20mtp. Initial infrastructure costs are always high but approved scale up FID becomes a no brainer if we have the go ahead (Arup provide quaitity surveying that says scale up can be cost effective along with port and rail upgrade via gov backing).
All falls back on support of Gov. IMO which hopefully is only a matter of time as the3 technology is sound.
- Forums
- ASX - By Stock
- top strategic move by top team
Foz, BFS might not be favourable on a 2mtp, but over time and...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ECT (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.515M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $3.469K | 1.156M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
46 | 19513067 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 11596834 | 27 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
46 | 19513067 | 0.003 |
17 | 9642678 | 0.002 |
11 | 17800024 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 11596834 | 27 |
0.005 | 6082233 | 31 |
0.006 | 5239567 | 10 |
0.007 | 2995837 | 8 |
0.008 | 253913 | 3 |
Last trade - 15.57pm 21/06/2024 (20 minute delay) ? |
Featured News
ECT (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online