CZN 0.00% 0.6¢ corazon mining limited

top up rise project drill in april 2013, page-11

  1. 9,075 Posts.
    lightbulb Created with Sketch. 556
    it's not k111, it's a long shot, expensive project

    having been here for some time what ***** me off is the inconsistency

    fine the lake lynn ni project is off because ni is too low, but you read about the
    * the predictability of mineralisation down plunge,
    * the low cost opex scenario [from an old lake lynn feasibility kicking around the web]
    * and the previous commitments to conserve cash but follow the project thru thru etc etc

    the leverage on the lake lynn project, from this mkt cap, to a rising ni price is fantastic

    why the hell the decided to chase an expensive, long shot anom 700km west of alice springs in which the Brett is the vendor, but I doubt he'll actually chip in for the exploration, is beyond me.

    I know team Ironbark all own stock but the inconsistency, the poor timing relative sp and cash balance and the vend scenario just leave a pretty sour taste

    in the end, a long shoot for break even, and another group of directors to cross of the backable-team list
 
watchlist Created with Sketch. Add CZN (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
0.000(0.00%)
Mkt cap ! $4.007M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 166000 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 2026515 5
View Market Depth
Last trade - 16.12pm 08/11/2024 (20 minute delay) ?
CZN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.