it's not k111, it's a long shot, expensive project
having been here for some time what ***** me off is the inconsistency
fine the lake lynn ni project is off because ni is too low, but you read about the
* the predictability of mineralisation down plunge,
* the low cost opex scenario [from an old lake lynn feasibility kicking around the web]
* and the previous commitments to conserve cash but follow the project thru thru etc etc
the leverage on the lake lynn project, from this mkt cap, to a rising ni price is fantastic
why the hell the decided to chase an expensive, long shot anom 700km west of alice springs in which the Brett is the vendor, but I doubt he'll actually chip in for the exploration, is beyond me.
I know team Ironbark all own stock but the inconsistency, the poor timing relative sp and cash balance and the vend scenario just leave a pretty sour taste
in the end, a long shoot for break even, and another group of directors to cross of the backable-team list
- Forums
- ASX - By Stock
- CZN
- top up rise project drill in april 2013
top up rise project drill in april 2013, page-11
Featured News
Add CZN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.007M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 166000 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 2026515 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 166000 | 0.006 |
10 | 3247199 | 0.005 |
23 | 9971259 | 0.004 |
13 | 6972665 | 0.003 |
6 | 8301000 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 2026515 | 5 |
0.007 | 2141350 | 8 |
0.008 | 1826130 | 7 |
0.009 | 500000 | 1 |
0.010 | 569443 | 2 |
Last trade - 16.12pm 08/11/2024 (20 minute delay) ? |
Featured News
CZN (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online