TSV 0.00% 0.8¢ transerv energy limited

total depth, page-5

  1. 4,734 Posts.
    lightbulb Created with Sketch. 9
    max,
    Dont you read the anns??
    "The Warro #3 well is expected to reach its planned total depth by the end of the week at which time electric logs will be recorded. The fracture stimulation of the target gas zones will commence before the end of March and is expected to take 3 weeks to complete. This will be followed by an extended production testing during May and June."
 
watchlist Created with Sketch. Add TSV (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.