Hammerhead,
I thought I would add this from the "Wiki says:"
http://en.wikipedia.org/wiki/Burj_Khalifa
""Burj Khalifa's construction used 330,000 m3 (431,600 cu yd) of concrete and 55,000 tonnes of steel rebar, and construction took 22 million man-hours.""
""Burj Khalifa reached US $4,000 per sq ft (over US $43,000 per m2) and the Armani Residences, also in Burj Khalifa, sold for US $3,500 per sq ft (over US $37,500 per m2).""
That's a lot of concrete.
If the volume used was reduced by 20% how much floor space extra would they get.
My guesstimation,
150mt x 150mt x 2.9mt, now if the floor space was worth$10000m2 that extra space would be worth $225million:)
Any other takers too work it out?
- Forums
- ASX - By Stock
- EDE
- trading halt
trading halt, page-36
Featured News
Add EDE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.001(100%) |
Mkt cap ! $8.216M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $129 | 64.34K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
56 | 130683047 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 13252283 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
56 | 130683047 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 11007283 | 12 |
0.003 | 34879714 | 24 |
0.004 | 6587627 | 6 |
0.005 | 978500 | 3 |
0.006 | 245010 | 2 |
Last trade - 11.51am 15/11/2024 (20 minute delay) ? |
Featured News
EDE (ASX) Chart |
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online