RNE 0.00% 0.2¢ renu energy limited

trading halt, page-3

  1. 154 Posts.
    All looks good here

    ASX ANNOUNCEMENT 3 JULY 2008
    Cooper Basin Project Update
    Jolokia 1 Drilling Progress
    Geodynamics advises that the drilling of Jolokia 1 is progressing well. The 244 mm
    (9 5/8”) diameter casing has been run successfully to its design depth of 3,776
    metres and the annulus has been fully cemented.
    The forward drilling program will now focus on completing the well to intersect the
    target fracture zone. The casing and cement job has been pressure tested to prove
    its integrity, and drilling has commenced in the 216mm (8½”) open hole section using
    the proven managed pressure drilling approach to drilling the fractured granite. The
    current depth is 3,818 metres.
    Geodynamics advises that at a depth of approximately 3,805 metres, the first small
    fracture in Jolokia was intersected. This is exciting news as it confirms existence,
    earlier than expected, that the Jolokia location has water saturated over pressured
    granites consistent with the three Habanero wells. The purpose of stepping Jolokia
    out 9 km from Habanero was to indeed confirm the consistency of the targeted
    granites.
    Steam flow from Habanero 3 on 19th June 2008
    Jolokia 1 is located approximately 9 km from Habanero and is targeting fractured
    granites at a similar depth known to be 10°C hotter than the Habanero wells. Its
    target well depth is 4,250 metres
 
watchlist Created with Sketch. Add RNE (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $1.452M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $1.484K 741.8K

Buyers (Bids)

No. Vol. Price($)
5 1112086 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 12281983 15
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
RNE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.