DXI 0.38% $2.64 dexus industria reit.

03 November 2008Company Announcements PlatformAustralian Stock...

  1. 77 Posts.
    03 November 2008
    Company Announcements Platform
    Australian Stock Exchange Limited
    Exchange Centre
    20 Bond Street
    SYDNEY NSW 2000
    Via ASX Online
    UPDATE ON OPERATIONS AT SUGARLOAF JOINT VENTURE
    Adelphi Energy (Adelphi) is pleased to provide the market with an update on operations
    within the Sugarloaf AMI.
    Kowalik -1H
    Adelphi has been advised by the operator, Texas Crude Energy Inc (TCEI), that on 31
    October 2008 operations commenced to unload the Kowalik -1H well. As at 6am Texas
    time on 2 November 2008 the well was still cleaning up and was flowing gas,
    condensate, drilling and completion fluids. Once the well is fully unloaded, which may
    require a second chemical wash to remove mud from the well bore, the fully stabilised
    production rate will be advised.
    Weston -1H
    Adelphi has also been advised by TCEI that the Weston -1H well spudded on 2 November
    2008. At 6am the well was drilling ahead at a depth of 392 feet. The well site is located
    ~1.5km to the east of the Kennedy -1H well which is designed with a 6,000 feet horizontal
    section drilled to the south east.
    As previously advised, the well is targeting the upper chalk interval that has been
    reported to have successfully produced gas and condensate in four wells in the
    adjacent acreage and in which the Kowalik -1H well has been drilled.
    Adelphi has a 20% working interest in the Sugarloaf AMI. Other ASX listed participants in
    the Sugarloaf AMI and their respective working interests are:
    Aurora Oil and Gas Limited 20%
    Eureka Energy Limited 12.5%
 
watchlist Created with Sketch. Add DXI (ASX) to my watchlist
(20min delay)
Last
$2.64
Change
-0.010(0.38%)
Mkt cap ! $837.5M
Open High Low Value Volume
$2.65 $2.67 $2.62 $839.8K 318.9K

Buyers (Bids)

No. Vol. Price($)
2 8142 $2.63
 

Sellers (Offers)

Price($) Vol. No.
$2.65 7412 1
View Market Depth
Last trade - 16.10pm 13/11/2024 (20 minute delay) ?
DXI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.