Hi Spid81,
Thank you, for finally agreeing that WKT will need too expand the load out area.
So first Sentence above,
The load out area is at capacity, with all the Graphite bags, that are awaiting for loading on to the truck, that's why the truck will not be loaded from inside.
Second Sentence above,
The Telehandler will only be used to load the trucks out side, as it wheels are suitable for dirt and mud.
Third Sentence above,
So yes with 110 bags of Graphite being filled and ready for shipment, on a daily basis, then yes a bottle neck can occur.
Covered area outside is a very good idea, but how long and how high do you need to build this massive shed, cost wise as well.
Also a gantry is a good idea, if you built a large shed, where trucks drove inside and a 5 tonne gantry was used to load the trucks and then drove out.
So for once, you actually agree WKT should already expand it factory, as we are already reached our full capacity.
Can not wait till quaterly comes out.
IMHO
Regards
Rossi70
- Forums
- ASX - By Stock
- WKT
- Transport from Lindi
Transport from Lindi, page-61
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.6¢ |
Change
-0.001(1.03%) |
Mkt cap ! $64.44M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 9.6¢ | $59.26K | 611.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 143348 | 9.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.7¢ | 103258 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 143348 | 0.095 |
3 | 200000 | 0.094 |
1 | 50000 | 0.092 |
3 | 275000 | 0.090 |
1 | 50000 | 0.085 |
Price($) | Vol. | No. |
---|---|---|
0.097 | 103258 | 2 |
0.098 | 100000 | 1 |
0.105 | 427460 | 5 |
0.110 | 169999 | 3 |
0.115 | 188198 | 2 |
Last trade - 15.42pm 28/10/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |