AEV 0.00% 1.2¢ avenira limited

transport logistics study, page-4

  1. 2,953 Posts.
    lightbulb Created with Sketch. 624
    they include capital expenditure in the former - ie build accommodation for the truck drivers in year 1 but annualise the cost over 10 year mine life.

    "The above logistic arrangements translate to an overall transportation cost from the mine to the
    port shiploader at an estimated $93.31 to $73.80 per tonne for 1 Mtpa and 3 Mpta
    correspondingly.
    The annual transportation cost from the mine to the Port only is estimated to be $74.3 to
    $64.49 per tonne for 1 Mtpa and 3 Mpta correspondingly. The anaylised capital expenditure
    portion is within the range of 14 % to 25 %.
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.000(0.00%)
Mkt cap ! $32.44M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
8 2320432 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 321265 2
View Market Depth
Last trade - 13.11pm 10/09/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.