AEV 0.00% 1.0¢ avenira limited

they include capital expenditure in the former - ie build...

  1. 2,953 Posts.
    lightbulb Created with Sketch. 624
    they include capital expenditure in the former - ie build accommodation for the truck drivers in year 1 but annualise the cost over 10 year mine life.

    "The above logistic arrangements translate to an overall transportation cost from the mine to the
    port shiploader at an estimated $93.31 to $73.80 per tonne for 1 Mtpa and 3 Mpta
    correspondingly.
    The annual transportation cost from the mine to the Port only is estimated to be $74.3 to
    $64.49 per tonne for 1 Mtpa and 3 Mpta correspondingly. The anaylised capital expenditure
    portion is within the range of 14 % to 25 %.
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.