    ListerWA,
    I never suggested anything misleading. I did say I expected better gasflows by now. Their use of the words "significantly better than expected " means absolutely nothing unless you know what was expected.
    I have seen the results of plenty of fracced wells and there is always a report on how much fraccing fluid has been recovered. Not so with this mob.
    There was never a suggestion that the clean-up would take 60 days. The 60 days is the pre-planned test period during which all of the data is recorded including peak production, pressure variances , recovery of frac fluids etc etc . All that data enables them to predict an annual flowrate.
    The expected clean-up period was always in the range of
    1 to 3 weeks. If it is going to take 60 days I will have bailed long before then.
    Where do you get your 9 trading days from ?