I was using Excel and a circular method (as opposed to the normally used polygon method) to estimate the resource. So for each successful drill hole; I applied a radius of 50 meters (which is around half way between drill holes); then I multiplied that by the depth from the drill results; worked out the average grade for each drill; and applied a tonnage of 3t per cubic meter for dolerite.
Anyway; my resource estimation may be very conservative. I will keep BBX on watch and I hope to see a JORC estimation in the not too distant future.
- Forums
- ASX - By Stock
- Tres Estados Resource Estimation using Excel template
I was using Excel and a circular method (as opposed to the...
-
-
- There are more pages in this discussion • 189 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.001(8.33%) |
Mkt cap ! $10.79M |
Open | High | Low | Value | Volume |
1.3¢ | 1.3¢ | 1.3¢ | $611 | 47K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 110700 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 367747 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 110700 | 0.012 |
2 | 126483 | 0.011 |
6 | 1348035 | 0.010 |
2 | 300000 | 0.009 |
2 | 182548 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 367747 | 2 |
0.014 | 739562 | 3 |
0.015 | 250000 | 1 |
0.016 | 130000 | 1 |
0.018 | 597632 | 1 |
Last trade - 10.00am 30/09/2024 (20 minute delay) ? |
Featured News
BCM (ASX) Chart |