The silence is DEAFFF.....
Has everyone lost interest? Not me!
Here's part of the announcement......
A HMS treatment facility and associated infrastructure has been commissioned at the
Seppelt 2 site. This plant will treat a sample of approximately 20,000 tonnes of near
surface kimberlite and infill material at a rate of up to 30tonne/hr.
♦ The trial is expected to recover in excess of 15,000cts of diamonds (estimated value
A$1m) which will adequately fund the trial mining program.
SKR
unknown
The silence is DEAFFF.....Has everyone lost interest? Not...
Add to My Watchlist
What is My Watchlist?