The 950-ton "instant bridge" was assembled nearby and then...

  1. 31 Posts.
    The 950-ton "instant bridge" was assembled nearby and then lifted and lowered into place by special cranes, according to the Miami Herald.The process, which only lasted a few hours, was praised by Florida International University for significantly reducing risks to workers, pedestrians and motorists, and minimizing traffic disruptions.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.