EQR 11.4% 4.9¢ eq resources limited

From a discussion I had with Ian P.S the Ex CEO.Mitsubishi Japan...

  1. 1,401 Posts.
    lightbulb Created with Sketch. 8

    From a discussion I had with Ian P.S the Ex CEO.

    Mitsubishi Japan tungsten slurry processing plant is in China. (Maybe Plant safety reasons etc)

    I would be reluctant to sign a contract without a sample.

    Considering Sea Freight Door to Door transit times (2 Weeks) I would be thinking late April.
    Production 1st week April, transit, process last week April.

    Sit back enjoy the ride.

    Please DYOR.
 
watchlist Created with Sketch. Add EQR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.