I think there was a typo in the previous post title.
For content - From the eoy report and other sources the zones currently being tested are 3.5 times size of current "potential production zone" which is pegged at 950 mmcf/day. Implies expectation of total flow of 4-6 mmcf/day.
Nothing new but worth restating.
cheers
MD
ps - did not want to give the previous thread any mileage at all by replying.
- Forums
- ASX - By Stock
- tsv set to rumble
I think there was a typo in the previous post title. For content...
-
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)