Details of the farm-in are:
first $40m free-carried (this was expected to cover 2-3 wells plus seismic)
15% of the next 60m, so TSV needs to find 9m
10% of expenditure thereafter
would be nice to be able to get a sense of where expenditure is running at so far.
A cap-raising is a dead cert as far as I'm concerned