The latest update on production from Tui via NZOG indicates that things continue well.
Since July 1, 2009 through to September 23 Tui has produced 1,300,000 barrels approximately.
The present daily target for production is approximately 16,000 barrels
Looking ahead to the end of September and therefor the end of the quarter you would assume that Tui should have produced approximately 1,400,000 barrels this quarter.
The anticipated total for the year is 5 million barrels so the likely total be the end of this month would be a fairly good step towards that annual figure.
Add to My Watchlist
What is My Watchlist?