Will delay construction timelines for other deals. Ship building...

  1. 547 Posts.
    lightbulb Created with Sketch. 177
    Will delay construction timelines for other deals. Ship building contract is for a maximum of 8 ships. If 4 needed for twinza then last one due 9 months after first. If other contract signed 3 months after first contract then first ship would be expected 3 months after the last of the first contract. Basically 4 years after contract signed. That is my take.