Why is HM 5 not on site & running with HM 4?Why does everything take so long?Is it so hard to order both mills & have them delivered at the same time?Always delays with ordering, breakdowns, parts etc.Not the time to be moving in slow motion.
DUR Duratec snags $76.5M in works from Woodside and Defence respectively - including spy network upgrade