Excellent News ! This is the Truck that is going to be used to transport graphitic ore from Mahefedok deposit to the graphmada plant (in Lohorano) : probably a 2km trip (in-between there is a river, they are expanding and reinforcing the river bridge to facilitate the journey of this truck).
It is a 30 ton truck capacity designed for small mining operations. Assuming average 4% grade of the graphitic ore at Mahefedok, a 500 tons per month operation (6000tpa nameplate) requires : 12.500 tons of graphitic ore transported from Mahefedok to Lohorano or 416 tons per day. This necessitates on-average 14 trips of this truck per day or 1 round-trip per hour assuming 14 hours work day for the truck. (In other words, the truck will be a hard working machine ! Good luck to the truck lol !)
- Forums
- ASX - By Stock
- GW1
- Twitter progress
GW1
greenwing resources ltd
Add to My Watchlist
0.00%
!
3.2¢

Twitter progress, page-5
-
-
- There are more pages in this discussion • 90 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
3.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.787M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 125000 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 2857 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 125000 | 0.029 |
2 | 449999 | 0.028 |
2 | 1100000 | 0.027 |
2 | 230069 | 0.026 |
4 | 670000 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 2857 | 1 |
0.032 | 1003852 | 2 |
0.034 | 17860 | 1 |
0.035 | 12000 | 2 |
0.037 | 100820 | 1 |
Last trade - 16.00pm 29/07/2025 (20 minute delay) ? |
Featured News
GW1 (ASX) Chart |
Day chart unavailable