GW1 greenwing resources ltd

Excellent News ! This is the Truck that is going to be used to...

  1. 2,426 Posts.
    lightbulb Created with Sketch. 504
    Excellent News ! This is the Truck that is going to be used to transport graphitic ore from Mahefedok deposit to the graphmada plant (in Lohorano) : probably a 2km trip (in-between there is a river, they are expanding and reinforcing the river bridge to facilitate the journey of this truck).

    It is a 30 ton truck capacity designed for small mining operations. Assuming average 4% grade of the graphitic ore at Mahefedok, a 500 tons per month operation (6000tpa nameplate) requires : 12.500 tons of graphitic ore transported from Mahefedok to Lohorano or 416 tons per day. This necessitates on-average 14 trips of this truck per day or 1 round-trip per hour assuming 14 hours work day for the truck. (In other words, the truck will be a hard working machine ! Good luck to the truck lol !)
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.6¢
Change
0.000(0.00%)
Mkt cap ! $7.618M
Open High Low Value Volume
2.8¢ 2.8¢ 2.6¢ $1.021K 36.91K

Buyers (Bids)

No. Vol. Price($)
1 249999 2.6¢
 

Sellers (Offers)

Price($) Vol. No.
2.8¢ 45821 1
View Market Depth
Last trade - 16.10pm 04/07/2025 (20 minute delay) ?
GW1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.