Dicko,
Green Hornet suggests you go in and have a look how it is all done and gives the reason why you drill conventionally-tells you it is drilled and casing run and cemented then coil tubing unit rigged over well. Every well has to have at least surface casing drilled and cemented to stop leakage from the field.
They could use it after the surface casing is in place like at Umiat and what type of tubing is dependent on casing size. Coil tubing is mainly used for down hole work and if you had read all of your links properly you would or should have known this.
http://www.lincenergy.com/video_gallery.php
- Forums
- ASX - By Stock
- LNC
- UCG in Poland to commence
UCG in Poland to commence, page-21
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)