HXG 8.70% 2.1¢ hexagon energy materials limited

Now what sort of person calls another blogger "dummy" on a blog...

  1. 168 Posts.
    lightbulb Created with Sketch. 78


    Now what sort of person calls another blogger "dummy" on a blog that is designed for interested parties to share ideas and thoughts? Oh, Topdog does. Real classy.

    It's a matter of interpretation whether the $0.5m is required up front, as you insist. I read it as, if required due to overruns, to come from future revenue. Perhaps Topdog next time rather than posting kindergarten type name calling maybe just throw it open to the room? Or better still go play in another sandpit.

    The total consideration is US$6.0 million, comprising an upfront payment of US$2.0 million to fund the construction of the CDP and to complete the process of protecting the associated IP via worldwide patent applications; and US$4.0 million in Deferred Consideration, payable to IMC from Hexagon’s future AIM cash flows. Hexagon has also agreed to make an additional US$0.5 million available, if required, to meet any cost overruns which will be deducted from the Deferred Consideration component.


    Last edited by NZPepsi: 23/05/20
 
watchlist Created with Sketch. Add HXG (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
-0.002(8.70%)
Mkt cap ! $10.77M
Open High Low Value Volume
2.1¢ 2.1¢ 2.1¢ $654 31.12K

Buyers (Bids)

No. Vol. Price($)
2 46000 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 25000 1
View Market Depth
Last trade - 11.17am 26/09/2024 (20 minute delay) ?
HXG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.