    HARDMAN DRILLING PROGRAMME
    WEEKLY PROGRESS REPORT
    PAGES: 2
    Hardman Resources Limited (“Hardman”) provides the following progress report on its drilling
    activities:
    Uganda: Block 2 - Mputa-1 Wildcat
    The Mputa-1 well was spudded on 22 December and at 2200 hours, Uganda time (0300 hours
    WST) was drilling 18 5/8 inch surface hole at 104 metres.
    Mputa-1 will target a structural prospect with potential multiple objectives. The prospect was
    defined by the 2005 onshore seismic survey and oil seeps have been identified in the immediate
    area.
    The planned total depth is approximately 1,100 metres. The well location is 220 kilometres
    north-west of the capital Kampala and onshore 8 kilometres from Lake Albert. The location is
    60 kilometres south-west of the Butiaba Waki-1 well (drilled in 1938) and 87 kilometres northeast
    of the Turaco exploration wells drilled by Heritage in 2002-2004.
 