HDR hardman resources limited

uganda exploration drilling nzizi

  1. 3,559 Posts.
    Uganda Exploration Drilling Update: Nzizi-1 [Exploration Area 2]
    As of midnight on 30 October, the rig is on location and in the final stages of preparation for an anticipated spud date this week. Nzizi-1 is a slim-hole well that will be logged but is not planned to be tested, targeting Miocene aged sands 5.5km southwest of the Mputa-1 discovery well and updip of Mputa-2. Nzizi-1 has a planned Total Depth of 1,030 metres to penetrate the
    interpreted basement in this area of the basin.
 
watchlist Created with Sketch. Add HDR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.