I was not aware OH had stepped down..need to read annoucements more carefully next time.
There was no mention of oxide reserve replacement drilling in the quarterly, one can only hope that they have a program in the pipeline sometime soon. By the time the met/leach system is working efficiently the current reserves will be exhausted.
Can they heap leach sulphide ore? or do they need a conventional CIL plant? If they can't proces it, why were they drilling for it?
Management have many things to answer with share price now 0.072.
RNG Price at posting:
0.0¢ Sentiment: Buy Disclosure: Not Held