OAU 0.00% 0.5¢ ora gold limited

Find Below UMC announcement;RAILWAY PROSPECTPHASE ONE DRILLING...

  1. 48 Posts.
    Find Below UMC announcement;

    RAILWAY PROSPECT
    PHASE ONE DRILLING COMPLETED
    LOGGING SHOWS WIDESPREAD IRON ORE MINERALISATION
    The company is pleased to announce that the Phase One drilling program on a 100m by 160m grid at the Railway Prospect has been completed. This has involved 110 holes of RC drilling for 10,015 metres.
    Geological logging has shown widespread iron ore mineralisation as expected.
    Receipt of full assay results from the Phase One drilling program should provide the Company with sufficient information to enable an inferred JORC compliant resource to be calculated by July 2008.
    Phase Two – Drilling commences
    Infill drilling on a 100m by 80m grid has now commenced. It is estimated that about 50 holes for 5000m of RC drilling will be required for this phase.
    Page 1 of 1
    RC Drilling / Sampling May 2008
    Please direct
 
watchlist Created with Sketch. Add OAU (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $35.70M
Open High Low Value Volume
0.5¢ 0.6¢ 0.5¢ $30.04K 5.790M

Buyers (Bids)

No. Vol. Price($)
5 4070659 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 40650136 21
View Market Depth
Last trade - 16.10pm 27/06/2024 (20 minute delay) ?
OAU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.