EM2 0.00% 5.0¢ eagle mountain mining limited

IMO, they spent big on drilling fresh targets from ground level....

  1. 1,317 Posts.
    lightbulb Created with Sketch. 117
    IMO, they spent big on drilling fresh targets from ground level. That required roads be built on the hillside. Given they used the 18 km of existing development as a selling point, why didn't they do what they're doing now (u/g refurb and drilling) then? That's the logical place a restarted mine will commence from. Could have developed a 250,000 t reserve u/g and commence a 25ktpa operation from that. Use cashflow to explore around. Lots of the existing resource is spread out, requiring costly underground development to connect them or install second portals to access. The market see they've spent a crapload on drilling and need to spend a crap load more. Probably $50M worth along with PFS and DFS studies. That all equals significant dilution.

    It was probably Charlie who said stop faffing around looking for new targets/OREX etc. Just drill where we know there is mineralisation, and that's underground in existing development.
    Last edited by Jonnyash: 25/04/23
 
watchlist Created with Sketch. Add EM2 (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
0.000(0.00%)
Mkt cap ! $19.64M
Open High Low Value Volume
5.0¢ 5.0¢ 5.0¢ $16.43K 329.0K

Buyers (Bids)

No. Vol. Price($)
1 51021 4.9¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 58978 1
View Market Depth
Last trade - 15.24pm 16/08/2024 (20 minute delay) ?
EM2 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.