BHP has unveiled a fully electric jumbo at Olympic Dam to support the company’s target to reduce operational greenhouse gas (GHG) emissions, including by minimising reliance on diesel.
The 28.7 tonne, 14.5 metre-long battery-electric Epiroc Boomer M2 jumbo will be powered by a 150kW traction motor and 150kW battery system, eliminating GHG emissions from diesel. It will be tested for efficiency, productivity and comfort over the 12-month trial period.
Jumbos are used in underground mining development to drill holes, which are then loaded with explosives and open up new areas. Post-blasting jumbos install large bolts to stabilise mine walls. BHP currently operates 16 Epiroc jumbos at Olympic Dam.
The fully-electric Jumbo will also break new ground in its user experience by reducing noise and vibration, and eliminating heat and the emissions of diesel particulate matter.
https://www.australianmining.com.au/news/first-full-electric-epiroc-jumbo-at-olympic-dam/
_________________________
Ash here.
This is an important milestone. Next up: electric loaders and trucks. Underground miners want no diesel fumes, the torque of electric, less heat, vibration and noise.
Mining equipment suppliers a year ago (lost ref) announced priority on u/g electrification, two years, ahead of above ground applications.
Ash
- Forums
- ASX - By Stock
- BHP
- Underground going electric
BHP
bhp group limited
Add to My Watchlist
1.13%
!
$40.31

Underground going electric
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
$40.31 |
Change
-0.460(1.13%) |
Mkt cap ! $204.7B |
Open | High | Low | Value | Volume |
$40.42 | $40.62 | $40.14 | $297.4M | 7.379M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 498 | $40.31 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$40.32 | 1136 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 498 | 40.310 |
1 | 30 | 40.280 |
2 | 1220 | 40.270 |
1 | 40 | 40.260 |
1 | 30 | 40.250 |
Price($) | Vol. | No. |
---|---|---|
40.320 | 20 | 1 |
40.330 | 30 | 1 |
40.340 | 30 | 1 |
40.350 | 19954 | 2 |
40.360 | 155 | 2 |
Last trade - 16.18pm 17/09/2025 (20 minute delay) ? |
Featured News
BHP (ASX) Chart |