Good post mmerd. When going through all the drill results I wondered if it was possible to get two JORC reports (or more). Do one for Central LM down to, say, 75m, taking in all the high grade stuff and giving two or three years mining at 3.5 to 4% Cu Eq, and then a second JORC for the rest of the field including CLM below 75m?
Add to My Watchlist
What is My Watchlist?