AVZ 0.00% 78.0¢ avz minerals limited

Understanding lithium demand, page-18

  1. 2,521 Posts.
    lightbulb Created with Sketch. 2102
    Hi Scarpa
    I just noticed you mentioned this,
    "1.0 EV spodumene needs
    If you say take an average grade for PLS of say 1.26% Li20 at a 77.5% recovery rate, as per the DFS for the 2mtpa facility, you need 6.2 tonnes of ore to get to 6% spodumene concentrate (6.2 tonnes of ore feed *1.26% * 77.5% = 1 tonne of 6% grade spodumene). So at 2mtpa ore feed it can produce say 322,600 tonnes of 6% grade spodumene. Yes I know AVZ has a higher grade so for us a 2 mtpa facility at a ore grade of 1.5% Li20 and 80% recovery (given grade our recovery is likely to be slightly higher than PLS) yields 400,000 tonnes of 6% grade spodumene, meaning AVZ is likely to produce an additional 24% additional tonnes to PLS from a 2 mtpa ore feed facility."

    I believe your calculations are a little bit off. Could you re-do your calculations using these figures and see what you get.

    5.8 t for LCE conversion for Greenbushes / AVZ.
    7.5 t for PLS
    8.0 t for AJM
    9 tons +++ for everyone else.

    AVZ metallurgical testing.
    http://member.afraccess.com/media?id=CMN://6A884593&filename=20180521/AVZ_01983126.pdf

    historical Belgian work carried out which produced a 6.8% Li2O concentrate.”
 
watchlist Created with Sketch. Add AVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.