MGT magnetite mines limited.

Understanding the demand for Green Steel, page-176

  1. 1,130 Posts.
    lightbulb Created with Sketch. 278
    Pedal to the metal: iron and steel’s US$1.4 trillion shot at decarbonisation | Wood Mackenzie


    https://hotcopper.com.au/data/attachments/4888/4888969-5c6a396c8d90908cd93dfadaedd964d9.jpg


    US$800-900 billion will be essential to greening existing steelmaking infrastructure, setting up new DRI and electric arc furnaces and developing a hydrogen ecosystem for steel.High-grade iron ore consumption will have to increasefive fold to 750 million tonnes.

    Miners will need to play an active role in cutting operational emissions and investing in new high-grade mines and DR pellet capacities, all of which translate into a US$250-300 billion investment. Two-thirds of the investment by iron ore miners will be dedicated to the exploration of new high-grade ore mines and abating emissions from existing operations. Forward integration into pellet manufacturing for DRI manufacturing capacity will consume the rest."

    An oldie but a goodie. 6x demand for high grade ore. MGT needs to get this baby into production ASAP. Merry Christmas everyone.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
8.0¢
Change
0.002(2.56%)
Mkt cap ! $9.681M
Open High Low Value Volume
8.0¢ 8.2¢ 7.9¢ $21.75K 272.0K

Buyers (Bids)

No. Vol. Price($)
1 12258 7.9¢
 

Sellers (Offers)

Price($) Vol. No.
8.0¢ 1596 1
View Market Depth
Last trade - 15.47pm 27/06/2025 (20 minute delay) ?
MGT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.