MGT 2.70% 38.0¢ magnetite mines limited.

Understanding the demand for Green Steel, page-530

  1. 1,007 Posts.
    lightbulb Created with Sketch. 250
    THis article cant come at a better time.

    The three phases to green steel production | Spectra (mhi.com)

    https://hotcopper.com.au/data/attachments/5891/5891029-0bb3dfab4fda3aa8b6438ce36b439d8e.jpg

    Meanwhile, new technologies are emerging at an auspicious time. With about 70% of all BFs worldwide requiring relining by 2030, producers have a near-term opportunity to shift toward two key innovations: direct reduction of iron ore (DRI) and electrification.The MIDREX direct reduction process has gained traction worldwide as a leading DRI process, with immediate benefits for the reduction of CO2 and the production of high-quality merchant hot-briquetted iron (HBI). "

    To cut things short, these people are going to rush to secure supply and the last 3 phases needs high quality ore. The BF-BOF is only going to probably going to be used in india for another 5-10 years before they realize that no european/asian countries are buying their raw steel due to carbon tax/penalties, etc.

    I hope Gemma and team have a good update for us!! WOOHOO
 
watchlist Created with Sketch. Add MGT (ASX) to my watchlist
(20min delay)
Last
38.0¢
Change
0.010(2.70%)
Mkt cap ! $37.40M
Open High Low Value Volume
37.5¢ 38.0¢ 37.0¢ $9.043K 24.23K

Buyers (Bids)

No. Vol. Price($)
1 98792 37.0¢
 

Sellers (Offers)

Price($) Vol. No.
38.0¢ 10000 1
View Market Depth
Last trade - 13.09pm 06/06/2024 (20 minute delay) ?
Last
37.5¢
  Change
0.010 ( 1.35 %)
Open High Low Volume
37.5¢ 37.5¢ 37.5¢ 30
Last updated 11.57am 06/06/2024 ?
MGT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.