Completely agree. Then take into account:
- another 100m (to 500m) in width adds 7.5 MT. Some parts of the box are actually 600m wide.
- another 200m in length (to 1200m) adds 6 MT. They have already drilled hole 32D which would take it to 1250m if that intersects mineralisation
- another 100m in width and 200m in length adds 15 Mt, i.e., ~46 MT total.
And the deposit is still open to the west, to the north, and to the east. The north gets deeper of course, but no reason that can't switch from open pit to underground at that point and continue a narrow band ala cupric's zone 5.
- Forums
- ASX - By Stock
- MOD
- Undervalued?
Undervalued?, page-2
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)