EDE 0.00% 0.2¢ eden innovations ltd

unusually quiet, page-43

  1. 3,018 Posts.
    lightbulb Created with Sketch. 1238
    Hi Sampreap, jokes a side. Markyboy49 in his last couple of posts gave us an outline of events that will take place between now and end of the year that will help push the share price north, in the short term it may fluctuate a bit, just have to hold tight and be patient. Just in case you missed what he had to say, here is what he had to say based on his opinion and findings. I find him to be honest, helpful, knowledgeable, accurate and has a good grasp on events of this company. He his a LTH, along with many others. If you need answers it is better to direct it to them, as they are ready and willing to help.

    Here is what Markyboy49 had mentioned:

    Here is an updated version of what these significant event/milestones are and when IMHO they are likely to happen. I hope this is a bit of a help.
    1. May to December. News of major private commercial orders (should come at regular intervals).
    1. May/June. News that the GDOT has signed off on their Class B specs.
    1. On May 25th Warren Green will be giving his speech at the Concrete Service Life Extension Conference in Florida on the subject: "Experiences with the Design of Repair & Protection Measures for Concrete Structures in Australia". At the same conference on Tuesday May 24th at 3 pm the topic: Effect of Carbon Nanomaterials Embedded in a Cementitious Matrix" will be presented which is highly likely to mention EdenCrete. IMHO if EdenCrete is not on the concrete industry's radar already it certainly wil be after this conference! Here is the link to the Concrete Service Life Extension Conference technical program: http://www.nace.org/uploadedFiles/Events/Seminars/Concrete-Technical-Program-2016.pdf
    1. June. News that the GDOT has started ordering EdenCrete for Class B applications.
    1. June. GS announces whether or not a very small CR will be required to complete Colorado Stage 2 (A CR is unlikely IMHO).
    1. June. Release of ASTM C 494 freeze/thaw and the 180 day compression test results.
    1. July. News that other DOT's have put in orders for Class B applications (will only happen after point 2.)
    1. June/July. News that the GDOT has laid the section of highway which will commence the Class A/ Class1 GDOT field test which will be a huge step towards the GDOT approving EdenCrete for Class A/Class 1 applications (roads/highways/bridges).
    1. July. Quarterly due out at the end of July which should give more detail into the profitability of EdenCrete etc.
    1. September/October. News that the GDOT's final approval/specs have been completed for Class A/Class 1 applications.

    1. October/November. The GDOT commences ordering EdenCrete for Class A/Class 1 applications.
    1. November/December. News that other DOT's have put in orders for Class A applications (will only happen after point 10.).

    Of course there may be other additional significant events, however, I believe that the above covers most things and the timing of them is reasonably accurate.
    Last edited by posiedon ark: 31/05/16
 
watchlist Created with Sketch. Add EDE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.