CTP 0.00% 5.2¢ central petroleum limited

up-ramp, down-ramp: a cognitive study, page-36

  1. 15 Posts.
    Phase 1 is

    5 CSG Wells
    Seismic
    2 Conventional Wells Ooraminna 2 and Johnstone 1
    Gore in EP115

    Phase 2


    Represents the rest of the Conventional wells

    The CSG Core holes do not cost $5m as you suggest.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.2¢
Change
0.000(0.00%)
Mkt cap ! $38.48M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 292051 4.9¢
 

Sellers (Offers)

Price($) Vol. No.
5.1¢ 500000 1
View Market Depth
Last trade - 11.37am 11/07/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.