CTP 0.00% 5.2¢ central petroleum limited

up-ramp, down-ramp: a cognitive study, page-37

  1. 9,674 Posts.
    lightbulb Created with Sketch. 3054
    NO......from CTP website. Notice the word "survey" in phase 1 in regard to wells planned for phase 2, perhaps that is where the confusion lies. No conventional wells will be drilled as part of phase 1.

    "Phase One 2009
    5 fully cored CSG wells Pedirka Basin (initial exploration for 3470 TCFG prospective resources CSG, >10,000 TCFG UCG)
    Gore survey Johnstone, Suprise, Stuart and North West Mereenie (c.900 MMbbls UOIIP)
    1,350 line km seismic (Amadeus and Pedirka)"

    "Phase Two 2010-the Company has a number of prospects either ready to drill or which will be ready to drill throughout 2010 including the following :
    3- 6 conventional wells (Amadeus Basin) :
    Ooraminna 2, gas up to 2TCFG.
    Johnstone 1 oil up to 500 MMbbls UOIIP Ordovician (Mereenie style) and other horizons, Surprise, Stuart, NW Mereenie, all within EP 115
    Magee 2 gas, condensate, Helium, up to 500 BCF UGIIP,15 BCF Helium UGIIP, subsalt
    An oil well in the Rawson Resources Limited EP 97 Simpson Prospect Block"
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.2¢
Change
0.000(0.00%)
Mkt cap ! $38.48M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 292051 4.9¢
 

Sellers (Offers)

Price($) Vol. No.
5.1¢ 500000 1
View Market Depth
Last trade - 11.37am 11/07/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.