CTP 4.17% 5.0¢ central petroleum limited

up-ramp, down-ramp: a cognitive study, page-39

  1. 3,084 Posts.
    lightbulb Created with Sketch. 5
    thezulu,

    Please check out the presentation from Friday.

    Page 10:

    Phase One 2009 commenced December 2009 : CSG drilling and seismic
    - 5 fully cored CSG wells- (Pedirka Basin) - 2 to go, now 4 wells confirming over 100m net coal
    - GoreTM survey Johnstone, NW Mereenie - 2/3 complete
    -1,350 line km (Amadeus and Pedirka Basins) - 1/2 complete
    Subtotal c.$25 million

    Phase Two 2010 commencement Q2 2010 : 3+ conventional wells
    - Ooraminna-2 gas, 2 TCFG UGIIP - already flowed gas-spud May 2010 target
    - Johnstone-1 (and/or Surprise, Stuart and NW Mereenie) oil up to 500 MMbbls UOIIP (shale gas/oil potential, will core the HVS)
    -
    Magee-2 gas, condensate, Helium 0.8 TCFG, 15 BCFG Helium UGIIP - previous flow
    -
    Simpson Prospect Block EP 97-oil
    Subtotal c.$22 million
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
0.002(4.17%)
Mkt cap ! $37.00M
Open High Low Value Volume
4.9¢ 5.1¢ 4.7¢ $44.05K 911.5K

Buyers (Bids)

No. Vol. Price($)
2 20000 5.0¢
 

Sellers (Offers)

Price($) Vol. No.
5.2¢ 164625 2
View Market Depth
Last trade - 15.01pm 21/06/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.