MCO 0.00% 11.0¢ morning star gold n.l.

up,up,up and aweigh, page-25

  1. 2,409 Posts.
    lightbulb Created with Sketch. 995
    If the plant runs at 10t/hr for 24hr/day for 365 days = 87360t/annum. So we need to be getting 240t/day to the surface. To do this we would need, estimated with my very limited laymans knowlege, 3-4 stopes producing. I don't think the winder is a problem carting that amount but I would like clear guidance as to where that number of high grade production stopes are. What is the timeframe for getting them into production and whether we can get the number of experienced airleg miners required.
    Perhaps the Rose of Denmark can assist with tonnages but with that you get the problem of it being JV ore and you would need to thoroughly clean the circuit between runs of 100% MCO and jv ore as I have always heard that gold gets stuck in the circuit to some degree.
 
watchlist Created with Sketch. Add MCO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.