Are you sure? It was my impression the failures during the logging of the main bore were at surface during pre-run tool checks. Even if the tool had failed in the hole it's likely to have been during an op check at the casing shoe...not in open hole.
On the sidetrack the RCX tool was wrecked during the fishing operation. There was no working backup tool but even if there hasd been, I am fairly sure by the time they had gotten the thing down to the Angwa on drill pipe (on wireline would have been a suicide mission) the hole would have started deteriorating mechanically and chances of getting pressures and samples would have been diddly squat. The fact they had to push a packer down with the drill string during the P and A operations confirms the hole was going to shit mechanically.
- Forums
- ASX - By Stock
- IVZ
- Upcoming JRI-Invictus Webinar Questions
Upcoming JRI-Invictus Webinar Questions, page-760
-
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $95.53M |
Open | High | Low | Value | Volume |
6.3¢ | 6.5¢ | 6.3¢ | $3.835K | 60.87K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 161111 | 6.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.4¢ | 53427 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 161111 | 0.062 |
2 | 120000 | 0.061 |
8 | 450484 | 0.060 |
5 | 251949 | 0.059 |
7 | 521058 | 0.058 |
Price($) | Vol. | No. |
---|---|---|
0.064 | 53427 | 2 |
0.065 | 115479 | 3 |
0.066 | 85000 | 2 |
0.067 | 44775 | 1 |
0.068 | 116145 | 4 |
Last trade - 11.26am 18/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online