GS
I dont think you can apply a NPV $17-20/brl to Mirage/Ventura.
The field was last reported to be running at a net operating loss so its actually a liability while its mostly producing water.
Anyway, at least you try to present something tangible, unlike some others
I don't think the constant ramping on this thread amid no news is going to do the sp any good.
It smacks of desperation and raises a red flag if anything.
Add to My Watchlist
What is My Watchlist?