As much as it is disappointing repairs are required, sometimes it cannot be helped. Many individual components have travelled very long distances via road to reach the pad. Just the vibration from the roads is enough to snap off poorly supported components. Shit happens unfortunately. For the depths and pressures this rig will be dealing with, we want it in tip top shape.
Bring on the drilling!!
- Forums
- ASX - By Stock
- NWE
- Upcoming Spud of Lockyer2
Upcoming Spud of Lockyer2, page-153
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)