A thread to track upcoming events. It can be difficult to keep track because PFE has six projects across 17 tenements totalling 2,115 square kilometres of land across Western Australia.
Here's the upcoming drill schedule that I am aware of:
July 2022:
Hellcat (Base metals) - 4 Diamond drillholes for 1,800 metres.
Weelarrana (Mn) - 25 RC drillholes at MA (Manganese Area) 1 for 1,000 metres.
September 2022:
Weelarrana - RC drilling at MAs 2 and 3.
Quarter 4 2022:
Frederick (Pb, Ag, Zn) - Drilling expected.
The company has been doing a bunch of sampling, surveying, modelling and mapping across various tenements, which is ongoing at the Yampi projects, Hellcat, Weelarrana and Frederick.
With $5.5 million in cash, the 13c share price equates to an EV of roughly $4.5m.
- Forums
- ASX - By Stock
- Upcoming works (Manganese, copper, base metals)
A thread to track upcoming events. It can be difficult to keep...
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PFE (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.001(2.50%) |
Mkt cap ! $10.99M |
Open | High | Low | Value | Volume |
4.1¢ | 4.1¢ | 4.1¢ | $1.558K | 38K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 15000 | 4.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 6500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 15000 | 0.041 |
3 | 563450 | 0.040 |
2 | 130441 | 0.039 |
1 | 13289 | 0.038 |
2 | 300000 | 0.037 |
Price($) | Vol. | No. |
---|---|---|
0.042 | 6500 | 1 |
0.045 | 292804 | 3 |
0.046 | 300000 | 1 |
0.050 | 850000 | 1 |
0.053 | 15865 | 1 |
Last trade - 12.27pm 16/05/2024 (20 minute delay) ? |
|
|||||
Last
4.0¢ |
  |
Change
0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
4.0¢ | 4.0¢ | 4.0¢ | 46967 | ||
Last updated 11.53am 16/05/2024 ? |
Featured News
PFE (ASX) Chart |